Yahoo France Recherche Web

Résultats de recherche

  1. Il y a 1 jour · A GE Haliade-X turbine in the Vineyard Wind 1 project area south of Martha’s Vineyard. Photo credit: Eric Haynes Photo credit: Eric Haynes Vineyard Wind LLC, the offshore wind developer currently building the 806-MW Vineyard Wind 1 project in the US, has reported blade damage on a wind turbine in its offshore development area.

  2. Il y a 1 jour · In 1838 Henry Rawlinson, building on the 1802 work of Georg Friedrich Grotefend, was able to decipher the Old Persian section of the Behistun inscriptions, using his knowledge of modern Persian. When he recovered the rest of the text in 1843, he and others were gradually able to translate the Elamite and Akkadian sections of it, starting with the 37 signs he had deciphered for the Old Persian ...

  3. Il y a 1 jour · The building was known as the University Main Building upon its completion in 1841 before changing its name to honor the state's first governor, Stevens T. Mason, in 1843. In 1849, a twin building called South College was constructed south of Mason Hall. University Hall, built between 1871 and 1873, connected the two buildings, which were then referred to as the South Wing and the North Wing.